Sökning: "SYSTEMS PLANNING"

Hittade 26 exjobbsförslag från svenska företag, som innehöll ordet SYSTEMS PLANNING.


Inkom Exjobbsförslag
2012-03-26Machine learning algorithm for a neural network car- following model (inaktivt)
2012-02-21Future collaboration and interaction techniques for marine systems (inaktivt)
2011-12-01Using Google Solutions for System Design (inaktivt)
2011-11-23Detection of Low Probability of Intercept Radar Emitters (inaktivt)
2011-08-26Enterprise Architecture Modeling at KTH (inaktivt)
2011-08-22Which system solution should be chosen at a future electrification of the roads for electric lorries? (inaktivt)
2011-08-17Detection of Low Probability of Intercept Radar Emitters (inaktivt)
2011-07-28True 3D visualization for neurosurgery (inaktivt)
2011-07-01Controlled HVDC feeder in railway power supply systems (inaktivt)
2011-06-27Master theses on traffic simulation, impact models and sustainable traffic control (inaktivt)
2011-05-17Power quality analysis in the 130 KV connection of an 110 MW wind farm (inaktivt)
2010-11-16Programming Optimisation and Processor Evaluation (inaktivt)
2010-10-04Driver Behavior Model Estimation (inaktivt)
2010-04-14Driver behavior model estimation (inaktivt)
2008-05-30PhD position Coherent optical communicaitons (inaktivt)
2008-05-30Coherent 100 Gb/s optical communications link (inaktivt)
2007-06-30In-situ TEM force sensor/Nanoindenter - MEMS sensor development (inaktivt)
2007-04-16IDA-exjobb: A study of explanation facilities for a meal planning system and the relation to trust (inaktivt)
2007-02-12Development of SW drivers on a microcontroller (inaktivt)
2006-05-03Re-Design and Evaluation of the User Interface of a Meal Planning System (inaktivt)
2006-04-15Adaptive grid methods for on-line trajectory planning (inaktivt)
2005-08-16Analys av optimeringsmetod vid automatisk schemaläggning (inaktivt)
2005-04-25IDA-exjobb: A design space analysis of user interfaces for a meal planning system for elderly (inaktivt)
2005-02-25Evaluation of RT-Linux for mobile measurement systems (inaktivt)
2005-01-24Design and implementation of a constraint satisfaction algorithm for meal planning (inaktivt)
2002-10-18Scheduling of airline crews - The group construction problem (inaktivt)


Informationen om uppsatsförslag är hämtad från Nationella Exjobb-poolen.